Contracts

Deputy RI EM Declaration for equipment maintenance


Deputy RI EM Declaration for equipment maintenance

I hereby certify that:

  • I have read and understood the UK Farmcare requirements for equipment maintenance as laid out in the Practice operational manual.
  • I have in my possession a copy of the OV/ATT required equipment list, the maintenance checklist and McLintock/VGrip syringe instructions.
  • I am able to dismantle, clean, sterilise and reassemble McLintock/VGrip syringes according to the manufacturer’s instructions.
  • I have received adequate training from my Practice to be able to perform routine maintenance and calibration on test equipment.

Training date: Trainer:  

  • The maintenance of testing equipment will be carried out in accordance with the UK Farmcare ‘Maintenance Checklist’ and recorded. This maintenance will be carried out by (tick as appropriate):

  • Before the audit period, I have personally checked that all OVs carry all required equipment.

Deputy RI EM Name:  

Practice Name:  

Leave this empty:

Signature arrow sign here


Signature Certificate
Document name: Deputy RI EM Declaration for equipment maintenance
lock iconUnique Document ID: 7ee507848e4a4053cfc054aa48f9c806f786ced4
Timestamp Audit
10th October 2024 3:12 pm GMTDeputy RI EM Declaration for equipment maintenance Uploaded by UKFarmcare Admin - admin@ukfarmcare.com IP 87.127.55.97
10th October 2024 3:18 pm GMTGR Test - gemma.rowe@ukfarmcare.com added by UKFarmcare Admin - admin@ukfarmcare.com as a CC'd Recipient Ip: 87.127.55.97
5th November 2024 1:37 pm GMTAdmin email - admin@ukfarmcare.com added by UKFarmcare Admin - admin@ukfarmcare.com as a CC'd Recipient Ip: 87.127.55.97